Brand Name

By the end of 2016: testing of Dinh Ba bridge, Tan Hong district, Dong Thap province:

  • Diagram of bridge: 5 spans x 24.54m. The structure of prestressed reinforced concrete girder, abutment and pier by reinforced concrete on 35x35cm pile
  • Bridge size: 7m + 2 margins x 1m = 9.0 m
  • Design load: H18 according to standard 22 TCN 18-79
  • Evaluation of post-test load level according to QCVN 41: 2016 / BGTVT:

+ Full-body Car: 29 tf

+ Semi-Trailer: 37 tf

+ Trailer: 42 tf