In November 2017, TVEn completed the inspection of Dat Set, on DT.848, Dong Thap province:
1. Construction scale:
- Type of Works: road bridges
- Class of Construction: Class IV
- Bridge Width: 9.7m + 2 sides x 0.4m = 10.5m
- Structure Diagram: 3 spans x 12.5 m
- Design load: H30 (22TCN 18-79)
- Structural type: prestressed reinforced concrete bridge, reinforced concrete pile and abutment, reinforced concrete pile 35x35cm
2. Test results:
- Unlimited load capacity
